I have included examples of just some of my work recently undertaken.
Please click on any thumbnail to view a larger image.
Falmouth, Cornwall Sept-Nov 2006
This was a complete property renovation from start to finish. It was
started in Sept 2006 and took me nine weeks to complete. Work that was
done to the property included, painting inside and out, a new fitted kitchen,
laminate flooring throughout the ground floor, front and rear gardens modernised
etc. Please click on the image for a more detailed before and after view. |
 |
Falmouth, Cornwall
A bathroom completed in Falmouth in 2005. Bath, sink and toilet were
replaced plus a pump for the shower was fitted under the bath to give a
decent flow rate on the gravity feed water system. All of the walls were
tiled using 10"x 8" ceramic wall tiles. All of the fixtures were
fitted as well - shower rail, glass shelf and towel. Please click on the
image. |
 |
Truro, Cornwall May 2006
This job in Truro involved laying new floor tiles and fitting new work
tops on two sides. The plumbing for the sink was renewed and the 40mm waste
was changed from push fit that was leaking to glued. Please click on the
image. |
 |
Plymouth, Devon 2005
This job in Plymouth in 2005 was one of the first work top and cabinet
door changes that I worked on. A new stainless steel sink unit and s/s
hob were installed plus a new oven. The work tops were replaced with 40mm
black granite laminate and all of the cabinet doors were replaced with
a maple effect with s/s door and draw handles. This job was completed in
three days. Please click on the image. |
 |
Falmouth, Cornwall April 2005
This was the second bathroom suite change that I have. All three units,
bath, pedistal sink and toilet were changed. A shower pump was installed
under the bath to give a nice pumped shower and all of the tiling was completed
by myself with the client giving me the design that they wanted. I also
installed all of the fixtures and fixing, shower and towel rails etc. Please
click on the image. |
 |
Falmouth, Cornwall, April 2006
Floor tiling in the utility room of a local cornish hotel. This job
involved completing the floor tiling, re-cutting the plinths under the
units and fitting new skirting boards. Please click on the image.
Click Here For
My Portfolio Page 2 |
 |